On-site investigations and site survey
for asbestos-containing materials (ACM) and other
hazardous materials (PCB, mercury, etc.)
Building plan and previous survey/sampling review
Bulk sample collection
Itemized quantification and condition of asbestos-containing materials
Schematic building layouts with bulk sample locations
Quantification of hazards to be abated/recycled
prior to renovation/demolition (ACM, PCB-containing
devices, Mercury-containing devices, refrigerant
gases)
Homogeneous area drawings for like ACM materials.
Itemized cost estimate for abatement budgeting
Sample preparation and submission for analysis
Report preparation
asbestos abatement design
Design
Initial site verification visit
Project planning
Review all prior data (surveys, drawings, past projects, additional bulk sampling if needed, etc.)
Preparation of Abatement Construction Schedule
Preparation and publishing of legal advertisement
Construction Documents For Bidding
Preparation of Biddable Abatement Documents
Invitation
of Contractors/ Legal Advertisement for competitive
bidding
IH Firm solicitation
CD
review with the Owner, Owner’s Representative
and Design Consultant
Bidding / Negotiation
Issuance for Bidding
Conduct
Pre-Bid Meeting/Walkthrough
Addenda
Development
Review of bids received,
recommendation-for-award
Construction Administration
Pre-construction meeting
Coordination of project with Owner, Abatement
Contractor and IH firm
Weekly progress observation visits during abatement and report