The first phase of this project was a 26,000 s.f.
facility that included a 450-seat Worship space,
Fellowship Hall, offices and classrooms. The building
incorporates a wonderful cross feature that surrounds
a baptismal font and extends vertically through the
Narthex roof. Future phases will include expansion
of the Worship area to 670-seat capacity, additional
classrooms and office space totaling approximately
16,500 s.f. of added space.
LOCATION - Milford, Iowa
CONTRACTOR – Christensen
Construction, Estherville IA
CONSTRUCTION COMPLETION –August
2006
DELIVERY METHOD –Public
Bid for General, Mechanical and Electrical Contractors
SQUARE FOOTAGE (SIZE)
Main Level – 25,951 square foot
PROGRAM
Worship Space, and supporting areas
Gathering/Narthex Space
Offices
Classrooms
Kitchen and Kitchenette
Fellowship Hall
PROJECT CONTACT - Jim Valen,
First Lutheran Church
CONSULTANTS
Structural: LS Engineers
Mechanical/Electrical: Dolejs Associates
exteriors:
(click to view)
interiors:
(click to view)
Church of St.
Joseph
Addition/Remodel
KJA’s relationship with St. Joseph’s
began back in 1988 with a Feasibility Study that
addressed the following specific needs: Handicapped
Accessibility; Remodeling, sub-dividing of the
existing Fellowship Hall to meet a need for additional
Classrooms and Meeting Rooms; and Excavation of
approximately 2,000 sq. ft. under the Sanctuary
and Narthex to provide additional Classrooms,
Nursery, Bride's Room, etc. Following completion
of that Study, an elevator was added.
Completed
in 2004, the most recent project is a beautiful
12,700 s.f. addition and 1,600 s.f. remodeling
project that houses the Parish offices, major
Gathering Space, Library, Nazareth Hall (social
hall), multi-use meeting rooms and classrooms.
Many beautiful accents from the existing building
were integrated in the addition including woodwork,
doors, brick, stonework, clay tile roof, etc.
LOCATION - Owatonna MN
CONTRACTOR – RW Carlstrom
CONSTRUCTION COMPLETION – June
2004
DELIVERY METHOD –Negotiated
General Contractor
SQUARE FOOTAGE (SIZE)
Addition – 12,700 square
foot
Remodel – 1,600 square
foot
PROGRAM
Gathering Space
Library
Nazareth Hall (Social Hall)
Multi-use meeting and classrooms
PROJECT CONTACT - Ron and
Jan Wolf, Committee
CONSULTANTS
Structural: LS Engineers
Mechanical/Electrical:
Dolejs Associates
“The
recent addition to our beautiful Parish was a
great success and had a wonderful outcome.” Parish
Trustee
exteriors:
(click to view)
interiors:
(click to view)
St. John Lutheran
Church
Addition/Remodel
Special design considerations were needed for
this historically significant church. KJA established
the needs, controlled costs and successfully
blended the existing building with the new addition.
This 9,200 s.f. addition includes a new gathering
space, elevator, administration offices, entry
and classrooms. A portion of the existing building
was remodeled for a new kitchen, restrooms, nursery
and classrooms.
LOCATION - Belle Plaine MN
CONTRACTOR – E. J.
Pinske Builders
CONSTRUCTION COMPLETION – October
2003
DELIVERY METHOD –Negotiated
General Contractor
SQUARE FOOTAGE (SIZE)
Addition – 9,200 square foot
PROGRAM
Gathering Space
Elevator
Administration
Offices
Entry
Classrooms
Kitchen
Restrooms
Nursery
Classrooms
PROJECT CONTACT - Susie Koepp
CONSULTANTS
Structural: LS Engineers
Mechanical/Electrical: Dolejs Associates
“St.
John Lutheran had the privilege of working with
KJA for our addition/remodel project. It was
with their expertise, interest in our project,
years of knowledge and dedication that made working
with them a pleasant and enjoyable experience.” Susie
Koepp, Council President
exteriors:
(click to view)
interiors:
(click to view)
Mount Olive
Lutheran Church
Masterplan/Addition
In order to meet the growing needs of this congregation,
KJA provided a Masterplan that not only addressed
the first priority, the Gathering Space, but also
planned for a future expanded educational program,
etc. Phase I was a new 12,000 s.f. addition including
a Kitchen, Fellowship Hall, Narthex area, Administration
area, restrooms, lobby, and Gathering space. Construction
was completed in December 2003. Phase II will
consist of expanding the Educational portion of
the building.
LOCATION - Rochester MN
CONTRACTOR – Market & Johnson
CONSTRUCTION COMPLETION – December
2003
DELIVERY METHOD –Negotiated
General Contractor
SQUARE FOOTAGE (SIZE)
Addition – 12,000 square foot
PROGRAM
Kitchen
Fellowship Hall
Narthex
Administration
Restrooms
Lobby
Gathering
PROJECT CONTACT - Pastor Peter
Nycklemoe
CONSULTANTS
Structural: LS Engineers
Mechanical/Electrical: Dolejs Associates
“Kane
and Johnson Architects provided creative, relational
and exceptional service for our 10,000 s.f. Church
building expansion project. The Building Committee
and Council Leadership found that they brought
vast experience in Church planning, sound knowledge
of the building and a willingness to be available
for day and evening meetings. We hold David Kane
and his staff in high regard . . ” Rev.
Peter Nycklemoe, Senior Pastor
exteriors:
(click to view)
interiors:
(click to view)
St. John Vianney
Catholic Church
Addition/Remodel
KJA’s design solution for this project
was to attach an addition to each side of this
existing building. The addition on the south
side of the building is approximately 4,270 s.f.
housing a Gathering Space, Baptismal font, library,
and two entry vestibules. The addition on the
north side of the building is approximately 6,280
s.f. housing a multi-use classroom, storage area,
accessible toilets, meeting rooms, kitchen, a
large multi-use dining area, and one entry vestibule.
The project also included parking lot expansion,
minor interior remodeling and a new air-conditioning
system.
Award-of-Excellence Winner from the MN
Associated Builders and Contractors.
LOCATION - Fairmont MN
CONTRACTOR – The Joseph
Company
CONSTRUCTION COMPLETION – February
2001
DELIVERY METHOD
SQUARE FOOTAGE (SIZE)
Addition (South) – 4,270
square
foot
Addition (North) – 6,280 square
foot
PROGRAM
Gathering Space
Baptismal Font
Library
Entry Vestibules
Multi-use
Classroom
Storage
Accessible Toilets
Meeting Rooms
Kitchen
Multi-use
Dining
PROJECT CONTACT - - Joe Burns,
Gathering Committee
CONSULTANTS
Structural: LS Engineers
Mechanical/Electrical: Dolejs Associates
“David
Kane is dedicated to the task, takes pride in
his work and has a superb ability to work with
parish committees. He shows genuine concern for
every aspect of the job . . . I feel they (KJA)
have become part of our team, just as concerned
about the project as every member of our building
committee.” Fr. Joe Fogal, Pastor and
Joe Burns, Building Chair